TABLE OF CONTENTS
7. ENVIRONMENTAL COMPLAINT AND
NON-COMPLIANCE
8. IMPLEMENTATION
STATUS OF ENVIRONMENTAL MITIGATION MEASURES
FIGURES
Figure 1 Project General
Layout
Figure
2 Air and Noise Monitoring
Locations
LIST
OF APPENDICES
Weather and Meteorological Conditions
during Reporting Month |
|
|
|
i.
The
Civil Engineering and Development Department HKSAR has appointed Fugro
Technical Services Limited (FTS) to undertake the Environmental Team services
for the Project and implement the EM&A works.
ii. This Monthly EM&A report presents
the environmental monitoring and audit works for the period between 1 May and 31
May 2019. As informed by the Contractor, major activities in the reporting month
were:
Excavation
and laying of drainage pipe and manhole;
Excavation
and ELS construction.
Construction
of SUS structure;
Construction
of District Cooling System;
Construction of Subway
A;
Construction of Subway
B; and
Construction of road
base and road pavement.
Breaches of the Action and Limit Levels
iii.
No Action / Limit
Level exceedance was recorded for 24-hr TSP and construction noise at KTD1a,
KTD2b and KER1b in the reporting month.
Complaint,
Notification of Summons and Successful Prosecution
iv.
No environmental
complaint, notification of summons and successful prosecution were received in
the reporting month.
Reporting Changes
v.
There was no
reporting change in the reporting month.
Future Key Issues
vi. The key issues to be considered in the
coming reporting month include:
Potential environmental impacts arising from
the above construction activities are mainly associated with construction dust,
construction noise, water quality, waste management and landscape and visual
impacts.